
AI electrical takeoff
Electrical takeoff from your PDF drawing set
Upload the drawings. The takeoff counts electrical devices by sheet and puts a mark on the drawing for each one, so you can check it: receptacles, lighting fixtures by type, switches, data, fire alarm and panels. It also lists the open items it finds in the drawings, estimates wire and conduit lengths, and prices a bid. Export CSV or JSON. The results arrive by email.
- PDF in, count out
- Open items listed
- CSV and JSON export
- Preparing
- Reading legend
- Counting sheet E1.01
- Cross-check
- Done
- Power28
- Lighting31
- Switches & controls8
- Data/fire alarm3
- Panels & equipment12
How it works
How the takeoff gets made
You send the drawings and read the result. The counting is done for you, sheet by sheet. If you want to see what comes back first, open a sample takeoff.
- 1You
Upload the drawing set
One PDF of the whole drawing set: plans, schedules, legend and notes.
Project on file
- 2Takeoff
The count
Electrical devices are counted by sheet and grouped: power, lighting, switches and controls, data, fire alarm and security, panels and equipment. Each one gets a mark on the drawing.
Counts by sheet
- 3Takeoff
The cross-check
Each line keeps its sheet, a status (new, existing, relocated or demolished) and a confidence level.
Status and confidence
- 4Takeoff
The open questions
Where the drawings disagree or leave something out, the takeoff lists a question you can send as an RFI, and notes the items it saw but did not count.
Questions and notes
- 5You
Check, price and export
Open the results and check any mark against its sheet. Then export CSV or JSON, price the bid with unit prices you edit, or download a proposal and RFI letters as PDF. An email tells you when it is ready.
Export, bid and documents
What it counts
Device groups, counted by sheet
Each line in the takeoff has a sheet, a status (new, existing, relocated or demolished) and a confidence level, so you know what to look at twice. The method follows how an estimator reads a set; our guide how to read electrical blueprints and the list of electrical blueprint symbols explain the basics.
More detail: the output and the CSV columns are on electrical takeoff software, the tests and the misses on AI takeoff software, an example from the count to a bid total on electrical estimating software, the proposal and RFI letters on electrical bid software, and who runs the product on the about page.
Power
Receptacles by type, dedicated outlets, disconnects.
Lighting
Fixtures by type, emergency and exit lights.
Switches and controls
Switches, dimmers, occupancy sensors.
Data, fire alarm and security
Data outlets, fire alarm devices, security devices.
Panels and equipment
Panels, transformers and other electrical equipment.
Demolition and existing
New, existing, relocated and demolished items are kept apart.
Tested on public bid sets
What we have tested so far
Three tests on public bid sets, each one open to read as a sample takeoff. Where we had a reference, we compared the count with a commercial takeoff service, and on the park restroom also with a hand count. The office set has no hand-verified reference. We do not quote an accuracy percentage: three sets are not enough for one, and you should still check the count before you bid.
- 82 of 82
Park restroom set
In a blind test, a larger Anthropic model (Claude Fable 5), run without our instructions, matched a commercial takeoff service on a small park restroom set: 82 devices. We counted the main device types by hand as well, and the numbers agreed (one receptacle near the panel was hard to read, 7 or 8). The product (Claude Sonnet with our instructions) also counted 82 in five runs, but we wrote the instructions with this set known, so that is not an independent test.
Read the sample - 55 vs 54
Music stage renovation
TakeoffServiceA scanned set with no text layer in the plans: 55 new devices against 54 from a commercial takeoff service.
Read the sample - 555
Office renovation set, 7 sheets
A large office renovation set: 555 new devices over 7 sheets, with new, existing, relocated and demolished kept apart. On two sheets it was within one device of a commercial service. There is no hand-verified count of this set.
Read the sample
What you get back
Totals, groups, lines and questions in one view
This is how a finished takeoff looks in your account. The totals come from our park restroom test; the rows are lines from the same run.
- Power34%
- Lighting38%
- Switches & controls10%
- Data/fire alarm4%
- Panels & equipment15%
| Item | Qty | Status |
|---|---|---|
| Duplex receptacle, GFCI (above counter) | 3 | New |
| Weatherproof GFCI receptacle | 4 | New |
| Type C downlight | 12 | New |
| Type W wall pack | 8 | New |
| Exhaust fan connection | 6 | New |
Keyed notes call for a time clock on the canopy, sign and exterior lights, but none is drawn. Quantity and location?
Open questions and RFIs
ExampleWhat is unclear gets written down, not guessed
When something in the drawings does not add up, the takeoff writes it down instead of guessing. Each question says what is unclear, why it matters, and what the takeoff assumed. Copy it into your construction RFI template.
RFI 1, sheet E-102 (example)
The panel schedule lists a 100 A feeder and the plan note says 200 A. Which one applies?
It changes the panel and feeder scope.
The schedule value, until the engineer answers.
What is unclear
Each question names the sheet and the conflict, ready to send.
Seen but not counted
Items the takeoff saw but did not count, such as fire alarm devices that a separate contractor installs, are listed apart so nothing is hidden.
Free resources
Guides, templates and calculators
Useful with or without the takeoff. Learn how to bid electrical jobs, download an electrical estimate template or a panel schedule template, or run a quick check with the conduit fill calculator or the voltage drop calculator.
GuideHow to bid electrical jobsOpen
GuideHow to read electrical blueprintsOpen
GuideElectrical blueprint symbolsOpen
TemplateElectrical estimate templateOpen
TemplatePanel schedule templateOpen
TemplateConstruction RFI templateOpen
CalculatorConduit fill calculatorOpen
CalculatorVoltage drop calculatorOpen
Pricing
Three plans, no setup fee
Early access: 1 free project up to 5 plan sheets. Not usable? Tell us within 14 days and we fix it or refund that project. Details are on the pricing page.
Single project
- One drawing set, one takeoff
- Full results and exports
- No subscription
Monthly plan
- 1 project included every month
- Extra projects $29 each
- Cancel anytime. No contract.
3-project pack
- About $39.67 per project
- Projects never expire
- Full results and exports
FAQ
Questions
Send the drawings. Check the count. Then bid.
Sign in, upload a PDF drawing set and get an email when the takeoff is ready.