Skip to content
Electrical estimator at a desk with printed electrical floor plans, highlighters and a laptop

AI electrical takeoff

Electrical takeoff from your PDF drawing set

Upload the drawings. The takeoff counts electrical devices by sheet and puts a mark on the drawing for each one, so you can check it: receptacles, lighting fixtures by type, switches, data, fire alarm and panels. It also lists the open items it finds in the drawings, estimates wire and conduit lengths, and prices a bid. Export CSV or JSON. The results arrive by email.

See sample takeoffs
FreeEarly access: 1 free project up to 5 plan sheets.
  • PDF in, count out
  • Open items listed
  • CSV and JSON export
Park restroom, sheet E1.01Example
Done100%
  1. Preparing
  2. Reading legend
  3. Counting sheet E1.01
  4. Cross-check
  5. Done
  • Power28
  • Lighting31
  • Switches & controls8
  • Data/fire alarm3
  • Panels & equipment12
Total devices82

How it works

How the takeoff gets made

You send the drawings and read the result. The counting is done for you, sheet by sheet. If you want to see what comes back first, open a sample takeoff.

  1. 1
    You

    Upload the drawing set

    One PDF of the whole drawing set: plans, schedules, legend and notes.

    Project on file

  2. 2
    Takeoff

    The count

    Electrical devices are counted by sheet and grouped: power, lighting, switches and controls, data, fire alarm and security, panels and equipment. Each one gets a mark on the drawing.

    Counts by sheet

  3. 3
    Takeoff

    The cross-check

    Each line keeps its sheet, a status (new, existing, relocated or demolished) and a confidence level.

    Status and confidence

  4. 4
    Takeoff

    The open questions

    Where the drawings disagree or leave something out, the takeoff lists a question you can send as an RFI, and notes the items it saw but did not count.

    Questions and notes

  5. 5
    You

    Check, price and export

    Open the results and check any mark against its sheet. Then export CSV or JSON, price the bid with unit prices you edit, or download a proposal and RFI letters as PDF. An email tells you when it is ready.

    Export, bid and documents

What it counts

Device groups, counted by sheet

Each line in the takeoff has a sheet, a status (new, existing, relocated or demolished) and a confidence level, so you know what to look at twice. The method follows how an estimator reads a set; our guide how to read electrical blueprints and the list of electrical blueprint symbols explain the basics.

More detail: the output and the CSV columns are on electrical takeoff software, the tests and the misses on AI takeoff software, an example from the count to a bid total on electrical estimating software, the proposal and RFI letters on electrical bid software, and who runs the product on the about page.

  • Power

    Receptacles by type, dedicated outlets, disconnects.

  • Lighting

    Fixtures by type, emergency and exit lights.

  • Switches and controls

    Switches, dimmers, occupancy sensors.

  • Data, fire alarm and security

    Data outlets, fire alarm devices, security devices.

  • Panels and equipment

    Panels, transformers and other electrical equipment.

  • Demolition and existing

    New, existing, relocated and demolished items are kept apart.

Tested on public bid sets

What we have tested so far

Three tests on public bid sets, each one open to read as a sample takeoff. Where we had a reference, we compared the count with a commercial takeoff service, and on the park restroom also with a hand count. The office set has no hand-verified reference. We do not quote an accuracy percentage: three sets are not enough for one, and you should still check the count before you bid.

  • 82 of 82

    Park restroom set

    In a blind test, a larger Anthropic model (Claude Fable 5), run without our instructions, matched a commercial takeoff service on a small park restroom set: 82 devices. We counted the main device types by hand as well, and the numbers agreed (one receptacle near the panel was hard to read, 7 or 8). The product (Claude Sonnet with our instructions) also counted 82 in five runs, but we wrote the instructions with this set known, so that is not an independent test.

    Read the sample
  • 55 vs 54

    Music stage renovation

    Takeoff
    Service

    A scanned set with no text layer in the plans: 55 new devices against 54 from a commercial takeoff service.

    Read the sample
  • 555

    Office renovation set, 7 sheets

    A large office renovation set: 555 new devices over 7 sheets, with new, existing, relocated and demolished kept apart. On two sheets it was within one device of a commercial service. There is no hand-verified count of this set.

    Read the sample

What you get back

Totals, groups, lines and questions in one view

This is how a finished takeoff looks in your account. The totals come from our park restroom test; the rows are lines from the same run.

Park restroom, takeoff readyExample
28
Power
31
Lighting
8
Switches & controls
3
Data/fire alarm
12
Panels & equipment
82
Total devices
  • Power34%
  • Lighting38%
  • Switches & controls10%
  • Data/fire alarm4%
  • Panels & equipment15%
ItemQtyStatus
Duplex receptacle, GFCI (above counter)3New
Weatherproof GFCI receptacle4New
Type C downlight12New
Type W wall pack8New
Exhaust fan connection6New
Open question

Keyed notes call for a time clock on the canopy, sign and exterior lights, but none is drawn. Quantity and location?

Open questions and RFIs

Example

What is unclear gets written down, not guessed

When something in the drawings does not add up, the takeoff writes it down instead of guessing. Each question says what is unclear, why it matters, and what the takeoff assumed. Copy it into your construction RFI template.

RFI 1, sheet E-102 (example)

The panel schedule lists a 100 A feeder and the plan note says 200 A. Which one applies?

Why it matters

It changes the panel and feeder scope.

Assumed

The schedule value, until the engineer answers.

What is unclear

Each question names the sheet and the conflict, ready to send.

Seen but not counted

Items the takeoff saw but did not count, such as fire alarm devices that a separate contractor installs, are listed apart so nothing is hidden.

Pricing

Three plans, no setup fee

Early access: 1 free project up to 5 plan sheets. Not usable? Tell us within 14 days and we fix it or refund that project. Details are on the pricing page.

Single project

$49one time
  • One drawing set, one takeoff
  • Full results and exports
  • No subscription
Best value

Monthly plan

$19.90a month
  • 1 project included every month
  • Extra projects $29 each
  • Cancel anytime. No contract.

3-project pack

$119one time
  • About $39.67 per project
  • Projects never expire
  • Full results and exports
See all plans

FAQ

Questions

Send the drawings. Check the count. Then bid.

Sign in, upload a PDF drawing set and get an email when the takeoff is ready.